PEMTK (Pemberitahuan Tempat Kerja) is how an employer tells DOSH that a premises is being occupied or used as a place of work. It’s a legal requirement under Section 27A of the Occupational Safety and Health Act 1994 (Act 514), and it’s submitted online through DOSH’s MyKKP system. Failing to notify is an offence — on conviction, a fine of up to RM100,000, imprisonment of up to a year, or both.
Based on DOSH’s official MyKKP user manual for PEMTK applicants, the following supporting documents are commonly required:
PEMTK is the current equivalent of what used to be called factory registration under the Factories and Machinery Act 1967, which was repealed on 1 June 2024. The process now runs through MyKKP under Section 27A of the Occupational Safety and Health Act 1994.
No. PEMTK is about notifying DOSH that a premises exists and is used as a place of work. PMT and CF renewal relate to regulated plant and machinery — such as pressure vessels, boilers, and lifting equipment — and are separate applications. A PEMTK is required before you can apply for CF.
Yes, as long as an employer and employee relationship has been established by organization.
As early as possible — ideally before the workplace starts operating, and definitely before a DOSH inspection or workplace accident forces the question. For an existing, unregistered workplace, the safest approach is to regularise the notification as soon as the gap is identified.
Typically within 20 working days.
Once DOSH has reviewed the application through MyKKP, the outcome is either a notification letter confirming the workplace has been recorded, or a rejection letter if the application is incomplete or not approved — both are issued through MyKKP under your PEMTK reference number.
A PEMTK notification does not expire or need periodic renewal like a Certificate of Fitness, but employers should update DOSH if the workplace’s activities, machinery, or ownership change materially.
Yes. MESH can confirm whether your workplace or activity is covered, prepare and check that your supporting documents — location plan, SSM certificate, process flowchart, machinery layout, and other letters — are complete and consistent before submission, handle the MyKKP submission itself, and follow up with DOSH on your behalf through to a decision.